Every second we save is critical to cost control. SmartSet EMT made a huge difference, and I look forward to using it on future projects.”
Even with 7,000 feet of conduit to run, the electrical contractor for Brampton, Ontario’s new Amazon Distribution Center didn’t have to worry about losing couplings or screws. SmartSet EMT eliminated the need for both, as well as for watertight connectors on vertical runs, helping reduce overall costs while saving time.
0
%
reduction in labor cost
0
%
material waste
0
K
sq. ft. of new construction